Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: ERP News, Crossroads MES

How Do I Determine If MES Is Right For My Business?

There are certain key questions that must be answered to determine whether or not an MES system would benefit your organization: 

  • How do you analyze OEE?
  • Is there an opportunity to reduce WIP inventory, indirect labor, downtime, waste or scrap?
  • What is the cost and impact of producing and distributing shop paper including drawings and work instructions?
  • Would you like to go paperless on your shop floor?
  • How are your continuous improvement initiatives tied to your ERP?
  • Is Management requesting real time production status reporting via dashboards or drilldown reports?
  • What different “islands of automation” exist on your shop floor?

The answers to each of these questions could have a significant impact on the profitability of your business. Want to quantify your results? Contact George Moroses today to schedule your FREE MES ROI Analysis.

Previous Article Consulting: Methodology for Infor LX & BPCS Upgrades
Next Article OTTO: Making plans happen isn’t just about monitoring material shortages
Print
23730 Rate this article:
No rating
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

The Facility Period Close process was introduced in Infor LX 8.3.4 and has been enhanced in 8.3.5. This feature allows continuous or 24-hour worldwide operations in multiple facilities to submit Period End Close jobs for each facility as daily operations cease, or shifts end.

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process.

Optimize Your Manufacturing Today!

First9394959698100101102Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories