Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Serialized Controlled Item >> to >> Non-Serialized Controlled item

Changing an item from serialized to not serialized can only be done by unchecking the Serialized flag in session Item - General (tcibd0101s000). 
The conditions for this are:

  • On Hand inventory is 0.00
  • On Order inventory is 0.00
  • Allocated inventory is 0.00

There are no records in the Inventory Transactions by item (whinr1510m000). Instead of removing all allocations and inventory, a new item may be created to replace the serialized item via the session Alternative Items (tcibd0505m000). Alternatively, the item can be converted from serialized in inventory to serialized not in inventory. 

In Item – Warehousing (whwmd4500m000) all the serial registration flags can be set to “No” and a Lot and Serial Registration Template (whwmd4102m000) can be linked in which all registration is explicitly excluded. In this way, although still serialized, the item is not subject to any serial registration and acts like a not serialized item.

Contact us today to learn more. 800.762.2077  | solutions@crossroadsrmc.com

Previous Article Infor LX & BPCS Tip: Support for IBM i 7.3 and Infor LX Products
Next Article Is it time to get more out of your ERP?
Print
17265 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

The Facility Period Close process was introduced in Infor LX 8.3.4 and has been enhanced in 8.3.5. This feature allows continuous or 24-hour worldwide operations in multiple facilities to submit Period End Close jobs for each facility as daily operations cease, or shifts end.

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process.

Optimize Your Manufacturing Today!

First9394959698100101102Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories