OTTO Q&A from the Director of Planning & Technology at Champion Industries

1.  How difficult is it to initially install OTTO?

Dead easy is the straight answer. We relied on you to install, and you installed in the predicted 1 hour.  

2.  Would you install it on a test system or on the production system?

Production system is another easy answer. I use OTTO as the ideal prototype when talking to business contacts about “add-on” products. It is non-invasive; it only reads data from our ERP files. I know the implementation is 100% safe because no ERP files are ever updated (read corrupted) by OTTO.

3.  How difficult was it to implement OTTO? Was there a negative impact on daily operations?

There is a learning curve involved in using any new tool that has value to add. OTTO implementation is very low on the impact scale, but I would strongly recommend that a prospective client plan on investing in education and practice. OTTO implementation is low impact. No valuable tool is “no impact”.

Click here to learn more about OTTO

Previous Article Is the Crossroads Analytics Dashboard Product Better than Spreadsheets?
Next Article What do you get with IDF?
Print
23669 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Job costing based on standards is great, but what if reality doesn’t match up to that?

What if jobs are really taking twice as long, and you don’t know that? What if jobs are taking ½ as long as you think, but you’re scheduling based on how much time they “should” take? Either way, you’re losing money and productivity. Getting a handle on start/stop times for jobs, and therefore the total amount of time actually spent allows you to take proper action and be more productive.

 

Optimize Your Manufacturing Today!

The Facility Period Close process was introduced in Infor LX 8.3.4 and has been enhanced in 8.3.5. This feature allows continuous or 24-hour worldwide operations in multiple facilities to submit Period End Close jobs for each facility as daily operations cease, or shifts end.

This enhancement provides a batch mode for the Facility Period Close (INV930) process and allows the Update IIM Inventory from IWI (INV931) process to be submitted from the INV930B program. The enhancement also provides a batch mode for the INV931 process.

Optimize Your Manufacturing Today!

First9394959698100101102Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories