Introducing VJES (Visual Job Execution Software)

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface between engineering and the paperless manufacturing floor. VJES makes available only one version of the work instructions – the RIGHT one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES gives production personnel the best opportunity to build it right the first time and provides a way to track worker productivity during the build at every step.

VJES Overview

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improvement of quality score from 68/100 to 93/100 in 12 months
  • During the first month of use, employee training timeframe improved from 1 week, to 3 days.
  • First pass yield percentage at 100% for 8 months straight this year.
  • Able to incorporate a quality cell after productivity increased due to newfound bandwidth received when adopting VJES.


Request a demo or Contact us to learn more.

Previous Article Infor LN & Baan Tip: Performance improvement by setting the First Free Number Cache (tcmcs0651m000)
Next Article We're excited to unveil our revamped BPCS/LX Technical Staff Augmentation Services
Print
8830 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

TECHNOLOGY: Facility Security Ranges

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

FINANCE: Expiration Date for Quotes and RMAs

A Cancel-by-Date has been added to the Quote Header and RMA Header panels. This optional field can limit how long a quote or authorization to return items for credit is valid.  

For quotes, this enhancement provides an optional end date for the quote. For RMAs, it provides an optional date by which the customer must return the items to receive the credit listed on the RMA.

The Cancel-By-Date prints on the Order Acknowledgement and RMA Acknowledgement to inform the customer of this important limitation to the quote or return authorization. 

An Order Entry user cannot copy the quote to create a new order if the Cancel By Date has caused the quote to expire.

OPERATIONS: Default Split Salesperson to Customer Orders

Sales commissions are based on combinations of the Primary, Split, and Line-Level salesperson and the commission codes defined for the customer and item. You can now define the Split Salesperson in the same master files as the Primary Salesperson. While the Primary Salesperson is mandatory, the Split Salesperson is optional. It defaults during Order Create using the identical hierarchy as Primary Salesperson. Using Split Salesperson provides more flexibility in the calculation of sales commissions. The ability to define a default Split Salesperson improves the accuracy of sales commission qualification and calculation and reduces maintenance and adjustments necessitated by corrections.

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

12345678910Last

Theme picker

Tips: LN | Baan

Here are some issues that you might run into if you stay on an old porting set too long:

  • Incompatibility because of operating system patches
  • Printing issues because of out-of-date libraries
  • Potential performance issues if binaries are not updated
  • Updating third-party products may not be possible because of dependencies
  • Limited support from Infor
  • Issues with updating database software/patches because of dependencies (if the database is also running on the same server as the application)

Need help getting on a newer porting set? Let us know! We’d be happy to help.

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.