If you can't see everything that happens on your shop floor, you are at a competitive disadvantage

If you’re not able to see everything that happens on your shop floor in real time, you’re at a HUGE competitive disadvantage! Your competitors are running MES. 

Crossroads MES software provides:

  • A user-friendly interface and an easy exchange of information between the shop floor users and your ERP database. 
  • Planners the ability to schedule work to a specific machine or work area. In addition, it allows for work to be re-sequenced and split for better flexibility in scheduling shop floor activities.
  • Factory workers with the ability to receive the work schedule electronically as well as interacting with it by reporting transactional activity.
  • The ability to electronically display Drawing, Process Instructions, and Quality Instructions so you can eliminate, or minimize, the need for some of the paper on the shop floor.
  • The ability to pass shop floor transactional activity to dashboard displays as well as the ERP system. 

Click here to learn more about Crossroads MES 

or Contact Anthony Etzel today to learn more.

Previous Article Infor LN & Baan Tip of the Week: Job Groups in LN
Next Article Crossroads RMC is proud to announce the release of the following dashboard views that come STANDARD with the LX Analytics Dashboard
Print
23228 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Role-Based Security introduces Role type profiles and allows combining the use of Role profiles with the traditional LX User type security profile functionality. The new Role type profile can be defined to allow or deny access to All Products, Attention Key, Products, Programs, and Transaction Effects. Facility, Warehouse, and Company securities are still defined solely by the User profile settings and are not affected by the assignment of a Role. Where applicable, the Role authority is displayed alongside the User authority on the security profile maintenance screens making it easy to see where there are differences in authority between the User and the assigned Roles. 

When Users are assigned to Roles, security access in LX becomes a combination of authorities granted or denied by the Role, plus any User Exceptions. User Exceptions override authorities set by the Roles. A User can also be assigned to more than one Role.

12345678910Last

Theme picker

Tips: LN | Baan

There can only be one correction period, and it must be the last period in the period table.

There can only be a correction period for Fiscal periods and not for Reporting or Tax. This period is used for the posting of the Automatic Balancing of Profit and Loss entries as well as any auditor adjusting entries that may be made outside the normal year. This allows you to print a trial balance and financial statements of period 1-12, for example, eliminating any of those adjusting entries.

If you have the Company Parameter (Balancing of Profit & Loss) set to Individual Accounts, then it is critical to have a 13th period to post those entries to. With this setting, the Automatic Balancing will zero out each individual P&L account in the last period. You want this to be period 13 and not period 12.

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

First142143144145147149150151Last

Theme picker

Categories