Infor LN & Baan Tip: The ABC’s & 123’s of Serialized Items
Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: The ABC’s & 123’s of Serialized Items

A serialized item is a physical occurrence of a standard item that is given a unique lifetime serial number. This enables tracking of the individual item throughout its lifetime, for example, through the design, production, testing, installation, and maintenance phases. A serialized item can consist of other serialized components.

In Service, a serialized item can be a customer-specific or owner-specific installation. Installation groups are a group of installations/serialized items such as photocopiers, computers, air conditioners, forklifts, lathe machines, and even aircraft.

A serialized item is identified by both the item code and serial number. You can set up the mask used to generate the serial numbers so the serial number includes some fields of the item data, such as the item group and the manufacturer.

In a multi-company structure, the companies can share the serialized item data. All the service departments in the various companies can refer to the same serialized items.

The serialized item can originate from a sales order or a project. The details of a serialized item indicate their origin, for example, by using specific sets of serial numbers for items that originate from sales orders and from projects. Serialized items can also originate from an as-built structure or directly from the production bill of material in Manufacturing.

In Service, serialized items can start their respective life cycles in As-Built mode or As-Maintained mode. Each serialized item, with or without its installation group, can be covered by a service contract or a warranty.

The serialized item status

Serialized items can be status controlled. Each serialized item can have the following status:

  • Startup - The serial number has been assigned, but the item is not yet included in a service order or contract. You can only change the status to Active.
  • Active - The serialized item is part of a service order or contract. You can only change the status to Revision.
  • Revision - You can only change the status to Active.


Serial numbers

A unique serial number is assigned to every manufactured item or purchased item. The serial number is assigned to track the item in its life cycle. You can define a dummy serial number for an item. The dummy serial number is a temporary number and can be used to monitor the item until a permanent number is assigned. For each serialized item, you can define an alternative serial number for customer reference. You can use the alternative serial number to search for items when you register calls, create service order activities, or register parts lines for a maintenance sales order.


Serialized item groups

You can group serialized items by serialized item groups. A serialized item group is a group of serialized items with similar features. You can define the serialized item groups that you need, for example, to categorize the skills required for the maintenance of the items, or as a basis for enquiries and reporting. For example, you can select service engineers on the basis of their skills for a specific serialized item group.


Serialized items in physical breakdown structures

Serialized items are the building blocks of physical breakdown structures. A physical breakdown structure is the relationship definition of a set of serialized items with their underlying parts and assemblies. Some serialized items, such as a photocopier, have a simple structure whereas other serialized items such as a ship or an aircraft have a complex structure.

A top serialized item occurs at the highest level in the physical breakdown structure, while the underlying structure consists of assemblies that are either effective or outdated. Use the Tree View option to display a graphic view of the structure.

Each serialized item in the breakdown can be linked to a functional element, with a common function across the entire structure, and can be used to group serialized items based on the functional importance.

Previous Article Infor LX & BPCS Tip: Did you know? One Time Vendor – ACP100D2-02 (Vendor Master Maintenance)
Next Article DASHBOARDS for IBM i WEBINAR
Print
9659 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

TECHNOLOGY: Facility Security Ranges

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

FINANCE: Expiration Date for Quotes and RMAs

A Cancel-by-Date has been added to the Quote Header and RMA Header panels. This optional field can limit how long a quote or authorization to return items for credit is valid.  

For quotes, this enhancement provides an optional end date for the quote. For RMAs, it provides an optional date by which the customer must return the items to receive the credit listed on the RMA.

The Cancel-By-Date prints on the Order Acknowledgement and RMA Acknowledgement to inform the customer of this important limitation to the quote or return authorization. 

An Order Entry user cannot copy the quote to create a new order if the Cancel By Date has caused the quote to expire.

OPERATIONS: Default Split Salesperson to Customer Orders

Sales commissions are based on combinations of the Primary, Split, and Line-Level salesperson and the commission codes defined for the customer and item. You can now define the Split Salesperson in the same master files as the Primary Salesperson. While the Primary Salesperson is mandatory, the Split Salesperson is optional. It defaults during Order Create using the identical hierarchy as Primary Salesperson. Using Split Salesperson provides more flexibility in the calculation of sales commissions. The ability to define a default Split Salesperson improves the accuracy of sales commission qualification and calculation and reduces maintenance and adjustments necessitated by corrections.

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

12345678910Last

Theme picker

Tips: LN | Baan

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.