Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt

VJES (Visual Job Execution Software) for Infor LN & Baan

​Every manufacturer relies on a few core metrics to manage operations: efficiency, productivity, capacity, and labor and equipment utilization. These benchmarks are used worldwide to assess performance and process effectiveness.

What if you could integrate quality control into every operation at every work center to ensure high-quality finished goods and simultaneously train high-quality operators? Manufacturing quality can be achieved using documented, repeatable, and measurable processes.

Introducing Crossroads RMC's ERP-independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface that bridges engineering and the paperless manufacturing floor. VJES ensures that only one version of the work instructions is available—the correct one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES provides personnel the best opportunity to build it right the first time and tracks worker productivity throughout the build process.

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improve quality scores from 68/100 to 93/100 in 12 months
  • Reduce employee training time from 1 week to 3 days within the first month of use
  • Maintain a first-pass yield percentage of 100% for 8 consecutive months this year
  • Incorporate a quality cell after productivity increases due to the bandwidth gained from adopting VJES
     

Contact us to learn more, or Request a Demo today!

800.762.2077

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Integration Transactions - Compression
Next Article Infor LX/BPCS Tips & Tricks for TECHNOLOGY: Security Manager
Print
4883 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Previously, Material Requirements Planning (MRP) preferred practices meant that the component's due date was the same as the parent's shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower-level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The Multi-Level Shop Order Release, SFC5302, has a new parameter for shop orders. The Due Date of Children = Release Date of Prent (Due Date of Children) field allows the user to set the due date determined for multi-level shop orders.

This feature uses different exchange rates in the user's inventory processes by using new macros in Post Inventory to G/L, INV920D. INV920 used macros limited by the Override Exchange Rate parameter set on the book in Book Definition, CEA105D3. If the Override Exchange rate parameter is set to No, the macro uses the Rate Type of the Book. If the Override Exchange parameter is set to Yes, the macro uses the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Warehouse Company, Order Company, or the Book regardless of the Override Exchange Rate parameter in the Book.

12345678910Last

Theme picker

Tips: LN | Baan

Watch this short video created by Infor which discusses the single/multi-logistic and finance concepts from Baan IV and Baan V and how that has changed in Infor LN with the introduction of Sites. With the Site concept and especially with the Job Shop by Site concept much more flexibility is provided.

Click to play Company versus Site Infor Video (16:19)

What items should be MPS planned, and what items should be MRP planned…

Master Scheduled Items are those items that are finished goods, or service items, that receive their requirements either specifically from Independent demand, or both Dependent and Independent demand.

  • Independent Demand is...
First2021222325272829Last

Theme picker

Categories