Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses

We're excited to unveil our revamped BPCS/LX Technical Staff Augmentation Services

We're excited to share some updates about our BPCS/LX Technical Staff Augmentation Services. At Crossroads, we're refining our staff augmentation structures to better cater to specific job descriptions. This enhanced offering is designed to provide our clients with the opportunity to seamlessly maintain product-level support (BPCS/LX – RPG) and development assistance. What sets this program apart is its ability to offer significant cost savings compared to traditional time and material arrangements. We aim to make staff augmentation more accessible and customizable to meet varying budgetary needs.

As part of this agreement, Crossroads will allocate a dedicated BPCS/LX technical resource for a set number of hours per week. The exact hours will be mutually agreed upon during the sourcing requirements discussions, ensuring that the support arrangement aligns perfectly with your needs.

Key Features of the Technical Staff Augmentation Service:

  • Flexible Hours: Tailored to your specific needs, we'll collaborate with you to determine a fixed number of hours per week that best aligns with your requirements.

  • Duration Options: Choose from flexible prepaid agreement durations of 3, 6, 9, or 12 months.

  • Remote Accessibility: Our technical services are primarily remote, but onsite assistance can also be discussed and arranged during the project kickoff phase, ensuring comprehensive support regardless of location.

  • Expertise Spectrum: Our dedicated BPCS/LX technical resources boast a comprehensive skill set, including proficiency in RPG, thorough documentation practices, design capabilities, familiarity with IBMi system foundations, job scheduling expertise, SQL proficiency, CL development capabilities, and more.

  • Scope Clarification: While our agreement primarily focuses on technical support and development assistance, application support falls outside the defined scope and can be considered separately upon request.

This innovative approach to technical staff augmentation is designed to streamline your operations, enhance system reliability, and empower your team to maximize the full potential of your BPCS/LX environment. Let's embark on this journey together, customizing technical staff augmentation solutions that precisely align with your business objectives and budgetary constraints.

Request a phone consultation or Learn More

Previous Article Introducing VJES (Visual Job Execution Software)
Next Article Unlocking the Full Potential of Your LX/BPCS Investment - Embrace the Cloud for Enhanced Connectivity
Print
7383 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

TECHNOLOGY: Facility Security Ranges

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

FINANCE: Expiration Date for Quotes and RMAs

A Cancel-by-Date has been added to the Quote Header and RMA Header panels. This optional field can limit how long a quote or authorization to return items for credit is valid.  

For quotes, this enhancement provides an optional end date for the quote. For RMAs, it provides an optional date by which the customer must return the items to receive the credit listed on the RMA.

The Cancel-By-Date prints on the Order Acknowledgement and RMA Acknowledgement to inform the customer of this important limitation to the quote or return authorization. 

An Order Entry user cannot copy the quote to create a new order if the Cancel By Date has caused the quote to expire.

OPERATIONS: Default Split Salesperson to Customer Orders

Sales commissions are based on combinations of the Primary, Split, and Line-Level salesperson and the commission codes defined for the customer and item. You can now define the Split Salesperson in the same master files as the Primary Salesperson. While the Primary Salesperson is mandatory, the Split Salesperson is optional. It defaults during Order Create using the identical hierarchy as Primary Salesperson. Using Split Salesperson provides more flexibility in the calculation of sales commissions. The ability to define a default Split Salesperson improves the accuracy of sales commission qualification and calculation and reduces maintenance and adjustments necessitated by corrections.

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

12345678910Last

Theme picker

Tips: LN | Baan

No matter how large or small your manufacturing plant is, efficiency and productivity relative to your capital investment are the keys to maintaining your competitive edge. Wasting time and money is not something anyone wants to do, but manufacturers need to be especially mindful of both and actively work to address any issues that lead to productivity or financial loss.

Source: https://www.onupkeep.com/blog/improve-production-efficiency/

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

First5152535456585960Last

Theme picker

Categories