Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel
/ Categories: Event / News

Crossroads Welcomes Ridewell Corporation – MES for Infor LX

Crossroads RMC welcomes Ridewell Corporation as our newest client having selected Crossroads MES (Manufacturing Execution System) for their shop floor automation with integration to Infor LX. 

Ridewell engineers and manufactures air-ride, rubber-ride, steel spring and mechanical suspension systems for the truck, trailer, RV and bus industries. The company has served the transportation industry since 1967 and holds many active patents for exclusive features that provide for low maintenance and superior ride quality.

Ridewell’s objective was to eliminate shop floor paperwork and manual processes, obtain real time performance metrics, and achieve greater visibility over manufacturing operations. After carefully conducting their due diligence they selected Crossroads MES to address these challenges.

Crossroads Manufacturing Execution System connects your manufacturing plant to the rest of your enterprise by using touch screen PCs on the shop floor. Powered by IBM I Power Systems, Crossroads MES fills the gap that exists between your ERP system and your lean manufacturing initiatives by modernizing and transforming the ERP experience. It delivers paperless shop packets to your entire workforce, captures live manufacturing data, and then delivers real-time status to your Tablet or PC.

Key Features include:

  • Paperless Shop Floor                               
  • Labor and Machine Time
  • Production Reporting
  • Material Issue
  • Scrap Reporting
  • Scheduling
  • Capacity Load Balancing
  • Label Integration
  • Dashboard Analytics                    

Crossroads MES provides information that helps manufacturing decision makers understand how current conditions on the plant floor can be optimized to improve production output.

Crossroads RMC is proud to have Ridewell Corporation as a client and we look forward to working together to support their company growth and success.

Previous Article BPCS/LX Tip of the Week: Shelf Life Days and Retest Days
Next Article Baan/LN Tip: Credit Control Parameters (ACR Parameters)
Print
21552 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

TECHNOLOGY: Facility Security Ranges

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

FINANCE: Expiration Date for Quotes and RMAs

A Cancel-by-Date has been added to the Quote Header and RMA Header panels. This optional field can limit how long a quote or authorization to return items for credit is valid.  

For quotes, this enhancement provides an optional end date for the quote. For RMAs, it provides an optional date by which the customer must return the items to receive the credit listed on the RMA.

The Cancel-By-Date prints on the Order Acknowledgement and RMA Acknowledgement to inform the customer of this important limitation to the quote or return authorization. 

An Order Entry user cannot copy the quote to create a new order if the Cancel By Date has caused the quote to expire.

OPERATIONS: Default Split Salesperson to Customer Orders

Sales commissions are based on combinations of the Primary, Split, and Line-Level salesperson and the commission codes defined for the customer and item. You can now define the Split Salesperson in the same master files as the Primary Salesperson. While the Primary Salesperson is mandatory, the Split Salesperson is optional. It defaults during Order Create using the identical hierarchy as Primary Salesperson. Using Split Salesperson provides more flexibility in the calculation of sales commissions. The ability to define a default Split Salesperson improves the accuracy of sales commission qualification and calculation and reduces maintenance and adjustments necessitated by corrections.

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

12345678910Last

Theme picker

Tips: LN | Baan

No matter how large or small your manufacturing plant is, efficiency and productivity relative to your capital investment are the keys to maintaining your competitive edge. Wasting time and money is not something anyone wants to do, but manufacturers need to be especially mindful of both and actively work to address any issues that lead to productivity or financial loss.

Source: https://www.onupkeep.com/blog/improve-production-efficiency/

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

First5152535456585960Last

Theme picker

Categories