BPCS/LX Tip of the Week: Email Distribution Lists

Anthony Etzel 0 23721 Article rating: No rating

Email Distribution Lists are new in Infor LX Version 8.

With this feature, users can create groups to which they may add internal or external email addresses, and in turn, use the name of the group when sending out the email.

The email distribution list eliminates the need for a program change if recipients need to be added to or deleted from the group. 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Clusters in LN

Kathy Barthelt 0 31964 Article rating: No rating

A cluster is a group of one or more warehouses in a particular geographical area. You can plan an item by cluster (geographical area).

To enable this, you can set up multiple plan items for one item. You always define one plan item without a cluster indication and multiple plan items with a cluster indication. A plan item with a cluster is called a clustered plan item, and a plan item without cluster is called the non-clustered plan item.

The plan items in the clusters can be supplied not only by distribution, but also through purchase and production. In this way, you can, for example, plan local purchasing in a cluster (geographical area). You can also plan supply from multiple sources.

 

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: When More = Less

Anthony Etzel 0 22309 Article rating: No rating

Do you have bottlenecks in your process due to product changeovers or breakdowns?
Maybe the answer is adding redundancy in the department where you are experiencing the problem. A duplicate machine setup can allow for double the capacity during high production periods. It can also eliminate the need to swap out tools or other materials due to different production runs. When breakdowns occur, equipment can be swapped out to keep production moving while repairs are being made.

Planning for this keeps production levels high.

 

 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: When More = Less

Kathy Barthelt 0 30953 Article rating: No rating

Do you have bottlenecks in your process due to product changeovers or breakdowns?

Maybe the answer is adding redundancy in the department where you are experiencing the problem. A duplicate machine setup can allow for double the capacity during high production periods. It can also eliminate the need to swap out tools or other materials due to different production runs. When breakdowns occur, equipment can be swapped out to keep production moving while repairs are being made.

Planning for this keeps production levels high.

 

 

 

Optimize Your Manufacturing Today!

RSS
First96979899101103104105Last

Theme picker

Tips:  LX | BPCS | M3

Previously, Material Requirements Planning (MRP) preferred practices meant that the component's due date was the same as the parent's shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower-level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The Multi-Level Shop Order Release, SFC5302, has a new parameter for shop orders. The Due Date of Children = Release Date of Prent (Due Date of Children) field allows the user to set the due date determined for multi-level shop orders.

This feature uses different exchange rates in the user's inventory processes by using new macros in Post Inventory to G/L, INV920D. INV920 used macros limited by the Override Exchange Rate parameter set on the book in Book Definition, CEA105D3. If the Override Exchange rate parameter is set to No, the macro uses the Rate Type of the Book. If the Override Exchange parameter is set to Yes, the macro uses the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Warehouse Company, Order Company, or the Book regardless of the Override Exchange Rate parameter in the Book.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips, Infor

Infor LN & Baan Tip: Company versus Site

Watch this short video created by Infor which discusses the single/multi-logistic and finance concepts from Baan IV and Baan V and how that has changed in Infor LN with the introduction of Sites. With the Site concept and especially with the Job Shop by Site concept much more flexibility is provided.

Click to play Company versus Site Infor Video (16:19)

Previous Article Infor LN & Baan Finance Tip: MPS Planned vs. MRP Planned
Next Article Infor LN & Baan Tip: Barcodes for Any Baan and Infor LN  Report – Did you know?
Print
20507 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories