BPCS/LX Tip of the Day: How Does LX Fit in With Just-In-Time?

Anthony Etzel 0 364 Article rating: No rating

For years, repetitive manufacturing industries have been applying many of the principles in Just-in-Time philosophy. They have established balanced production lines that depend on a steady flow of material to each work station. They schedule production in daily or weekly rates rather than in discrete shop order lots. They track finished inventory by work center rather than by job. They typically backflush stock balances (decrement stock balances upon completion of specific manufacturing steps rather than issued at the beginning of each production run).

 

Costing is typically based upon a daily rate or hourly rate rather than being associated with specific shop orders. 

 

Repetitive manufacturers use MRP II software adaptable to their environments

in the following key areas:


â–ª Product definition

â–ª Inventory tracking

â–ª MRP/Master Scheduling

â–ª Shop Floor Control

â–ª Purchasing

â–ª Costing

BPCS/LX Tip of the Day: What is Just-In-Time?

Anthony Etzel 0 313 Article rating: No rating

Just-in-Time (JIT) is a management philosophy that focuses on minimizing the resources necessary to add value to your products and to operate your factory in ways that eliminate waste. Resources are labor, materials, equipment, space, and time. Waste is anything that does not add value to your products. Moving work-in-process from place to place, stacking and sorting, investing capital in large work-in-process and raw material inventories, inspecting materials at your vendors' sites, and tying up warehouse space with finished goods are all activities that add cost, not value, to your products. 

JIT is a process that reduces lead time. JIT does not replace an MRP, an inventory program, a scheduling technique to bypass your Master Schedule, or a materials management project. JIT is the never-ending commitment of everyone, from top management to your workers on the floor, to maximize your effectiveness through continuous, incremental improvements.

Baan/LN Tip of the Day: Configuring Items

Kathy Barthelt 0 2237 Article rating: No rating

In LN, the configuration of a generic item not always results into a customized item. Configured items can now be customized items as well as standard items. If users configure items without PCS projects, standard items are generated instead of customized items.

 

The sessions for generating product variant structures for sales quotations and sales orders are moved from the Product Configuration module in Manufacturing to the Sales Control module in LN. The following new sessions are available in Sales Control:

â–ª Generate (Budget) Structure for Sales Quotations (tdsls1201m100).

â–ª Generate (Project) Structure for Sales Orders (tdsls4244m000)

RSS
First145146147148150152153154Last

Theme picker

Tips:  LX | BPCS | M3

TECHNOLOGY: Facility Security Ranges

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

FINANCE: Expiration Date for Quotes and RMAs

A Cancel-by-Date has been added to the Quote Header and RMA Header panels. This optional field can limit how long a quote or authorization to return items for credit is valid.  

For quotes, this enhancement provides an optional end date for the quote. For RMAs, it provides an optional date by which the customer must return the items to receive the credit listed on the RMA.

The Cancel-By-Date prints on the Order Acknowledgement and RMA Acknowledgement to inform the customer of this important limitation to the quote or return authorization. 

An Order Entry user cannot copy the quote to create a new order if the Cancel By Date has caused the quote to expire.

OPERATIONS: Default Split Salesperson to Customer Orders

Sales commissions are based on combinations of the Primary, Split, and Line-Level salesperson and the commission codes defined for the customer and item. You can now define the Split Salesperson in the same master files as the Primary Salesperson. While the Primary Salesperson is mandatory, the Split Salesperson is optional. It defaults during Order Create using the identical hierarchy as Primary Salesperson. Using Split Salesperson provides more flexibility in the calculation of sales commissions. The ability to define a default Split Salesperson improves the accuracy of sales commission qualification and calculation and reduces maintenance and adjustments necessitated by corrections.

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Manufacturing Tip: Performance Problems in Generate Order Planning (cprrp1210m000)

When the Generate Order Planning (cprrp1210m000) session is run it can take minutes to days to finish the process.

The performance of this session depends on many settings, like the number of plan items, the number of orders, but it also depends on hardware and database setup.

Here are some guidelines on how performance can be improved.

  • Be sure you are always on the latest solutions with the planning sessions. We are constantly improving the software to gain more speed in the Enterprise Planning (EP) sessions.
  • The number of planned items is critical. Try to reduce the number of planned items. Is it necessary that all items be planned via EP? For shop floor stock the TPOP or SIC replenish systems are often more suitable.
  • When you use PCS, be sure to close the projects when they are finished. When a PCS project has status Closed, the customized items will not be planned.

It's better to run Remove Plan Items for closed Projects (cprpd1220m000). This session removes the item planning data for customized items of closed projects.

  • If you run EP with the option, Also Generate Item Master Plan and/or Online Update Item Master Plan, consider if you need an Item Master Plan for all plan items. An Item Master Plan is usually meant for global long-term planning. Again this is not very useful for shop floor stock. Reducing the number of master-planned items improves performance.
  • When you use Resource Master Plans; are all your resources really critical? If a work center is not critical do not create a Resource Master Plan for it.
  • When using Item Master Plans and/or Resource Master Plans, set in Scenarios (cprpd4100m000) the total scenario length as short as possible. For example, if your sales order horizon is 2 years, a scenario end date which is 3 years after the current date is sufficient. During the calculations of the Item Master Plan and the Resource Master, all periods defined in the scenario are checked and calculated. So if you have the end date of the scenario on 2038, EP will do the calculations (for every master-planned item) until 2038.

Defining a rolling scenario will keep your scenario length constant and you don’t have to worry that you run beyond your scenario's end date.

  • Updating the pegging relations has a serious impact on the EP performance. In EP Parameters (cprpd0100m000) you can set the Pegging Horizon in days. Keep this horizon as short as possible. The Update Signals by Item/Planner option also has some impact, but less than the pegging.
  • EP uses the so-called phase numbers to detect the lowest level in which an item is used within a BOM structure or in a supplying relation. If the phase numbers are not ‘up-to-date’, EP will correct the phase numbers during the planning. This takes time during the planning run. If there are loops in BOMs or in supplying relations, this recalculation has a big impact on the performance. Therefore you could run Compute Phase Numbers (cprpd6200m000) on a regular basis. For example once a month. Always run this session with the Generate Report option selected. If loops are detected these are reported. Be sure to solve all the reported errors.
  • When unexpected results occur, especially when the data is imported from external packages, always check the number of records in tables cprpd100 and cprpd120. The number of records should match! Remark: From 10.4 onwards the table cprpd120 has become obsolete so this point not applicable anymore.
  • The number of calendars also impacts planning performance. Then for every warehouse, work center, or BP, and so on, a different calendar is defined. Planning has to read all of these calendars from start to end. This can have a huge impact on performance.
    • If you link a calendar to a work center or warehouse, avoid defining a new calendar for every work center/warehouse. Try to link the same calendar to more than one department.
    • Define the start of the calendar close to the start date of the scenario. For example, the current date is 01-07-2014, the start date of the scenario is 365 days in the past. So a start date for your calendar could be 01-07-2012.
    • Define the end date of the calendar not too far in the future. Depending on the end date of the scenario you could use 5 years ahead.  For example, the current date is 01-07-2014, the end date of the scenario is 3 years in the future. So an end date for your calendar could be 01-07-2022. Do not define an end date past 19-01-2038, which is the last UTC date Infor LN can handle.

Also, the interaction with the database can have a big impact on performance. 
A commonly used way to improve the total run time of the EP run is to start the session in parallel processing. 
See also Knowledge Base Article 22881401 Performance, Tracing and tuning Guide, for more details.

These guidelines are just some hints, and a good starting point because performance is a complex issue.

Previous Article Infor LN & Baan Tip of the Week: Limitations of Customer Defined Fields (CDFs)
Next Article Infor LN & Baan Tip: Broadcast message to users
Print
28330 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories