10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 32093 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

What's Your M.O.?

Report reveals the secret to optimal operational efficiency and how to discover your M.O. (Manufacturing Optimization)

SuperUser Account 0 21228 Article rating: No rating

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 40557 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 47216 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

RSS
First151152153154156158159160Last

Theme picker

Tips:  LX | BPCS | M3

Role-Based Security introduces Role type profiles and allows combining the use of Role profiles with the traditional LX User type security profile functionality. The new Role type profile can be defined to allow or deny access to All Products, Attention Key, Products, Programs, and Transaction Effects. Facility, Warehouse, and Company securities are still defined solely by the User profile settings and are not affected by the assignment of a Role. Where applicable, the Role authority is displayed alongside the User authority on the security profile maintenance screens making it easy to see where there are differences in authority between the User and the assigned Roles. 

When Users are assigned to Roles, security access in LX becomes a combination of authorities granted or denied by the Role, plus any User Exceptions. User Exceptions override authorities set by the Roles. A User can also be assigned to more than one Role.

12345678910Last

Theme picker

Tips: LN | Baan

George Moroses

Infor LX/BPCS Tips & Tricks for EXECUTIVES:

FINANCE: Default Billing Reason Code from User Order Class
This enhancement allows users to define a Default Billing Reason Code by User Order Class in addition to the Base Order Class. User Order Classes provide configurability for order processing events and the documents to be printed during those events. This enhancement allows users to configure different Billing Reason Codes for each User Order Class. If no specific code is defined, the system will default to the Billing Reason Code set up for the Base Order Class.

TECHNOLOGY:  Security Manager
New LX security type "M" for an LX Security Manager. Authority is similar to that of an LX Security Office (type "S"), but without the automatic authority to execute every LX program, and without the authority to change the authorizations of Security Officers and Security Managers. Users defined as LX security managers have authority to maintain security information for users other than themselves, but are only allowed to access regular LX programs if granted authority by an LX security officer.

OPERATIONS: Track All Order Holds Added & Released
Enhancement: Order Hold Audit Functionality
This enhancement introduces an audit file to track all holds added or released for customer orders. The audit file includes details for various types of holds: credit hold, margin hold, customer hold, user hold, and credit card hold. All applications that add or release a hold now write an audit record, capturing the user, date, time, and program associated with each hold action.

A new IDF Order Hold Audit Inquiry application allows users to review holds based on various criteria:

  • Hold type
  • User
  • Specific order
  • Transactions for a customer within a date range
  • Other combinations

Additionally, the selected data can be printed if desired.

Print
3118 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

x

Categories