10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 32112 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

What's Your M.O.?

Report reveals the secret to optimal operational efficiency and how to discover your M.O. (Manufacturing Optimization)

SuperUser Account 0 21266 Article rating: No rating

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 40605 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 47270 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

RSS
First151152153154156158159160Last

Theme picker

Tips:  LX | BPCS | M3

Role-Based Security introduces Role type profiles and allows combining the use of Role profiles with the traditional LX User type security profile functionality. The new Role type profile can be defined to allow or deny access to All Products, Attention Key, Products, Programs, and Transaction Effects. Facility, Warehouse, and Company securities are still defined solely by the User profile settings and are not affected by the assignment of a Role. Where applicable, the Role authority is displayed alongside the User authority on the security profile maintenance screens making it easy to see where there are differences in authority between the User and the assigned Roles. 

When Users are assigned to Roles, security access in LX becomes a combination of authorities granted or denied by the Role, plus any User Exceptions. User Exceptions override authorities set by the Roles. A User can also be assigned to more than one Role.

12345678910Last

Theme picker

Tips: LN | Baan

Anthony Etzel

Infor LX & BPCS Tip of the Week: ION Tip – Pausing Receiving and Sending of Messages

If it is necessary to pause sending and receiving of BOD messages on your IBM i during your month-end process, it is best practice for the document flows that point to the IBM i to guarantee delivery of BOD messages. Once the month-end process has been completed, you will need to Resume the ‘Receiving’ and ‘Sending’ Active Connection Points so your documents will continue to process.

Pausing Sending messages

To pause sending messages to ION:

  1. Select Connect > Active Connection Points.
  2. Select the connection point that must be paused for sending messages.
  3. In the Sending Paused column, click Pause. The page is automatically refreshed and the Sending Paused checkbox is selected. A Resume button becomes available. 

Sending of messages by this connection point is stopped. No new messages are picked up from the source application's outbox. The connection point still processes messages that were already picked up from the outbox. This action can take some time in the background even though the sending status of the connection point is already changed to Paused. Any new message, that was published from an application after the sending of its connection point is paused, has not yet entered ION and is not yet available in ION OneView.

Pausing Receiving messages

To pause receiving messages from ION:

  1. Select Connect > Active Connection Points.
  2. Select the connection point that must be paused for receiving messages.
  3. In the Receiving Paused column, click Pause. The page is automatically refreshed and the Receiving Paused checkbox is selected. A Resume button becomes available.

Receiving messages by the connection point is paused.  No new messages are delivered to the destination application's inbox. All new incoming messages to this application are parked in its incoming pending messages queue inside ION.  The connection point still processes messages that were already picked up from the incoming pending messages queue. This action may take some time in the background even though the receiving status of the connection point is already changed to Paused.

Resuming sending / receiving messages

To resume sending or receiving messages from ION:

  1. Select Connect > Active Connection Points.
  2. Select the connection point that must be resumed for message processing.
  3. Select one of these actions:
    1. To resume the pickup of messages from an application outbox, click Resume in the Sending Paused column.
    2. To resume the delivery of messages to an application inbox, click Resume in the Receiving Paused column.

The page is automatically refreshed and, depending on the selected action, the Sending Paused checkbox or the Receiving Paused checkbox is cleared. A Pause button is now available.

Print
43511 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

x

Categories