10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 32105 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

What's Your M.O.?

Report reveals the secret to optimal operational efficiency and how to discover your M.O. (Manufacturing Optimization)

SuperUser Account 0 21252 Article rating: No rating

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 40577 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 47232 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

RSS
First151152153154156158159160Last

Theme picker

Tips:  LX | BPCS | M3

Role-Based Security introduces Role type profiles and allows combining the use of Role profiles with the traditional LX User type security profile functionality. The new Role type profile can be defined to allow or deny access to All Products, Attention Key, Products, Programs, and Transaction Effects. Facility, Warehouse, and Company securities are still defined solely by the User profile settings and are not affected by the assignment of a Role. Where applicable, the Role authority is displayed alongside the User authority on the security profile maintenance screens making it easy to see where there are differences in authority between the User and the assigned Roles. 

When Users are assigned to Roles, security access in LX becomes a combination of authorities granted or denied by the Role, plus any User Exceptions. User Exceptions override authorities set by the Roles. A User can also be assigned to more than one Role.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip of the Week: Warehouse Blocking – LN 10.7

The functionality to block a warehouse for inbound or outbound transactions has been enhanced. A check for blocks is performed not only during receipt and shipment confirmation, but at multiple stages in the process. In addition, you can specify these blocking options for the inbound and outbound processes:

• No

• Yes

• Interactive

For example, if Blocked for Inbound is set to Yes, no inbound actions are allowed in the warehouse. Consequently, users cannot confirm receipts, generate and put away inbound advice or storage lists, and perform inbound inspections. 

If Interactive is set, during a non-automatic warehouse inbound procedure, warnings are displayed which offer the user a choice to either cancel the action or continue. Batch or automatic inbound processes continue, but the corresponding reports and logs make note of the blocking. However, in all scenarios, receipt confirmation is not allowed.

The same rules are applicable for the warehouse outbound procedure steps. The restriction for receipt confirmation also applies to shipment confirmation.

For warehouse transfer orders, not only the ship-from warehouse is checked for outbound process blocks, but also the ship-to warehouse. This prevents situations in which goods get stuck in transit due to inbound procedure blocks that apply to the destination warehouse. Now, the transfer process is already blocked during outbound.

Previous Article RMClabel offers significant advantages over other third-party label printing software
Next Article Infor LN & Baan Tip of the Week: Job Shop by Site Changes in LN 10.7
Print
36193 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories