Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

What's Your M.O.?

Report reveals the secret to optimal operational efficiency and how to discover your M.O. (Manufacturing Optimization)

SuperUser Account 0 21912 Article rating: No rating

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 41822 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 48429 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 28606 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

RSS
First153154155156158160161162Last

Theme picker

Tips:  LX | BPCS | M3

Previously, Material Requirements Planning (MRP) preferred practices meant that the component's due date was the same as the parent's shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower-level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The Multi-Level Shop Order Release, SFC5302, has a new parameter for shop orders. The Due Date of Children = Release Date of Prent (Due Date of Children) field allows the user to set the due date determined for multi-level shop orders.

This feature uses different exchange rates in the user's inventory processes by using new macros in Post Inventory to G/L, INV920D. INV920 used macros limited by the Override Exchange Rate parameter set on the book in Book Definition, CEA105D3. If the Override Exchange rate parameter is set to No, the macro uses the Rate Type of the Book. If the Override Exchange parameter is set to Yes, the macro uses the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Warehouse Company, Order Company, or the Book regardless of the Override Exchange Rate parameter in the Book.

12345678910Last

Theme picker

Tips: LN | Baan

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX & BPCS Tip: Support for IBM i 7.3 and Infor LX Products

On September 30, 2022, IBM® announced the end of support of IBM i operating system 7.3 effective September 30, 2023. In line with IBM’s support policy, Infor will no longer support LX and related products on IBM i 7.3 after May 31, 2024. All Infor LX releases, patches, and related solutions are planned to be delivered and compiled at IBM i 7.4, effective June 1, 2024. These deliverables will install and function on version 7 release 4 (IBM i 7.4) and above. This will require that your operating system is at a minimum release level of IBM i 7.4.

This policy extends to other Infor LX-related technologies including WebTop, System i Workspace (SiW), and Infor Development Framework (IDF).

Action Steps If you have not done so already, we recommend that you start planning and completing your upgrade to IBM i 7.4 or above prior to June 1, 2024. After this date, if you register a support call with Infor Support, and your application still runs on IBM i 7.3 or older, you may be requested to upgrade to a supported version of the IBM i operating system.

In addition, we invite you to log on to Infor Support to view and download important information regarding Infor LX. Knowledge Base (KB) articles have been created to proactively provide you with information regarding this Announcement. ​Please consider clicking on the “Subscribe” feature within each KB article to receive notifications. Once you have subscribed, you will receive notifications when they are updated.

  • View KB article 1397381 | Infor LX Product Bulletins and Announcements
  • View KB article 1947086 | Infor BPCS/LX Product Lifecycle Policy


If you need assistance in planning this project, Crossroads RMC is happy to help you strategize, and create project plans, test plans, 3rd party product due diligence, and cutover assistance. Contact us today to learn more. 800.762.2077  | solutions@crossroadsrmc.com

Print
12901 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

x

Categories