Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Cycle Counting Part 1

Anthony Etzel 0 49143 Article rating: No rating

Understanding: The Cycle Count Transaction

If you rely on BPCS to provide you with a cycle count list, the number of items could vary from day to day from a few items to count, to several. So the person doing the cycle counting may spend a few minutes to a few hours counting items. After the cycle count is complete, the balances are not changed until the reconciliation is complete. This process could take some time before the balances are changed.

The cycle count transaction process is similar to the physical inventory transaction process.

Baan/LN Tip of the Week: GRINYA

Kathy Barthelt 0 58516 Article rating: 3.0
GRINYA is one of the more complex issues in ERP Finance. GRINYA is the tracking via ledger account of the value of items received on a purchase order that have not been matched to a supplier invoice.

Baan solutions for Baan IV and V were incomplete. To take full advantage of the current GRINYA reconciliation process, check Infor solution #107147, which contains the GRINYA user manual and a link to download the software for your version of Baan. For ERP LN, look at Document Code U8942C US.

It is called User Guide for Reconciliation and Analysis. If you are not running the latest GRINYA solutions, patching will require a good amount of time in filling the Interim tables this solution runs from. Infor has posted several procedural write ups, so check the Support Site and read up before tackling this for the first time.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 46441 Article rating: No rating
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.
RSS
First157158159160162164165166Last

Theme picker

Tips:  LX | BPCS | M3

Role-Based Security introduces Role type profiles and allows combining the use of Role profiles with the traditional LX User type security profile functionality. The new Role type profile can be defined to allow or deny access to All Products, Attention Key, Products, Programs, and Transaction Effects. Facility, Warehouse, and Company securities are still defined solely by the User profile settings and are not affected by the assignment of a Role. Where applicable, the Role authority is displayed alongside the User authority on the security profile maintenance screens making it easy to see where there are differences in authority between the User and the assigned Roles. 

When Users are assigned to Roles, security access in LX becomes a combination of authorities granted or denied by the Role, plus any User Exceptions. User Exceptions override authorities set by the Roles. A User can also be assigned to more than one Role.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt

VJES (Visual Job Execution Software) for Infor LN & Baan

​Every manufacturer relies on a few core metrics to manage operations: efficiency, productivity, capacity, and labor and equipment utilization. These benchmarks are used worldwide to assess performance and process effectiveness.

What if you could integrate quality control into every operation at every work center to ensure high-quality finished goods and simultaneously train high-quality operators? Manufacturing quality can be achieved using documented, repeatable, and measurable processes.

Introducing Crossroads RMC's ERP-independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface that bridges engineering and the paperless manufacturing floor. VJES ensures that only one version of the work instructions is available—the correct one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES provides personnel the best opportunity to build it right the first time and tracks worker productivity throughout the build process.

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improve quality scores from 68/100 to 93/100 in 12 months
  • Reduce employee training time from 1 week to 3 days within the first month of use
  • Maintain a first-pass yield percentage of 100% for 8 consecutive months this year
  • Incorporate a quality cell after productivity increases due to the bandwidth gained from adopting VJES
     

Contact us to learn more, or Request a Demo today!

800.762.2077

Print
2280 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories