Baan/LN Tip of the Week: What could go wrong with GRINYA?

Kathy Barthelt 0 64765 Article rating: No rating
One common GRINYA issue would be incorrectly entered Integration Setups.

Check the Baan/LN manual for recommended Integration setups. If such a mistake were to occur, it is important to know for what period of time the Integration was in error. It is recommended that the Integrations Setup tables be audited either through Baan or Database Auditing. Corrections can be quickly calculated when an exact timeframe can be determined.

Baan/LN Tip of the Week: Differentiating An Item By Supplier - LN

Kathy Barthelt 0 67072 Article rating: No rating

In LN, you can differentiate between items at various suppliers:

  • Locations (warehouses),
  • Purpose (planning, purchase)
  • Origin (supplier, warehouse)

Example

An item is supplied by two different suppliers. Supplier A ships in lots of 100 pieces due to how the item is packed. Supplier B ships the goods in units of 60 pieces.

You can define specific parameters for each supplier. The following sessions can be used to define these characteristics:
 
  • Items - Planning (cprpd1100m000)
  • Check Item Data by Warehouse (whwmd2210m000)
  • Item Supplier Plan (cpvmi0530m000)
These sessions define entities that have an n-to-1 relationship with the general item data.

 

BPCS/LX Tip of the Week: Inventory Control

Anthony Etzel 0 53424 Article rating: No rating

In Infor LX you need to determine how inventory will be moved in and out of warehouse storage locations, and which of the following transactions to use for inventory control:


  • A transfer transaction can be used to move inventory from one warehouse location to another warehouse location.
  • A production receipt transaction is used to add inventory to a warehouse location.
  • A material issue or backflush is used to reduce inventory from a warehouse location.

New Definition of Insanity: Collect data the same old way

Anthony Etzel 0 82238 Article rating: 5.0

Just because you've always done it this way doesn't mean it's the best way. The old way of doing things may get the job done, but is the job being performed efficiently, accurately, and on a timely basis?

People resist change because there is an element of fear behind change and having to learn something new. Sometimes it’s just that you’re comfortable with how things are done, and you don’t see the need to make any changes. 


Are you stuck in manual?

Improve Profit and Cut Costs at the Same Time

Crossroads RMC 0 37850 Article rating: No rating

Want to Improve Profit and Cut Costs at the Same Time?

“Real-time executives averaged a 14% improvement in operating cash flow and achieved a 6% reduction in operating costs” According to the Aberdeen Group.

So, how do you accomplish this great feat? By streaming real-time data to the executives.

The need for visibility into what is happening in the trenches, and the comprehensive understanding of key metrics and their implications for overall performance, are critical for an organization to be at the “top of their game”.   read full article>

Learn how Crossroads RMC can provide for this data streaming with Analytics Dashboards.

Industry News: How Small and Mid-Sized Manufacturers Can Harness the Transformative Power of Technology…

Crossroads RMC 0 41455 Article rating: No rating

Industry-Specific Technology Changes the Game:

"One of the most significant changes has been the development of software and enterprise-wide technology that is designed to specifically meet the needs of particular industries. This has multiple advantages. The technology doesn’t have to be “over-configured” to be functional; the functionality is built-in. It can also be deployed quickly and cost-effectively, with less effort and less risk." Industry Week Article by Kelly McGowan, American Securities.

 

Crossroads RMC has software that has been built specifically for your industry. Learn how Analytics Dashboard can improve your efficiency, productivity, and quality while driving down costs.

Industry News: Technology - The Secret Life of the American Factory

Crossroads RMC 0 40304 Article rating: No rating

New Data: New Fruit…that’s the promise of finding new data sitting right there under your nose on the factory floor.

Doug Woods, president of the Association for Manufacturing Technology and MTConnect champion says it this way:
"At the end of the day," he explains, "after you've invested in hardware and machines, at some point it all comes down to how do you wring the maximum amount of productivity out of them? How do you get the ultimate efficiency out of the facility?" The only way to be confident you're doing that, he says, is to really understand what is going on with all of the equipment in the factory all of the time. And that, he says, comes down to having "really good data." 

Read Full Article>

Discover How Crossroads RMC can meet this need with Analytics Dashboard.

Baan/LN Tip of the Week: Project Templates

Kathy Barthelt 0 64620 Article rating: No rating

Project templates are useful because you can specify all of the information that you would normally want to include when creating a new project such as project structure, budget, and so on.

In Baan IV/V, project templates do not exist, but you can set up a project template by creating a regular project, and setting the status to simulated or free. This is done so that the project does not create plans. Under this scenario, you can easily copy one project to another.

In LN, when you create a new project, a template can be used as the starting point. This is similar to copying a normal project, but unlike normal projects, no costs or revenues can be posted on a template.

RSS
First162163164165167169170171Last

Theme picker

Tips:  LX | BPCS | M3

Role-Based Security introduces Role type profiles and allows combining the use of Role profiles with the traditional LX User type security profile functionality. The new Role type profile can be defined to allow or deny access to All Products, Attention Key, Products, Programs, and Transaction Effects. Facility, Warehouse, and Company securities are still defined solely by the User profile settings and are not affected by the assignment of a Role. Where applicable, the Role authority is displayed alongside the User authority on the security profile maintenance screens making it easy to see where there are differences in authority between the User and the assigned Roles. 

When Users are assigned to Roles, security access in LX becomes a combination of authorities granted or denied by the Role, plus any User Exceptions. User Exceptions override authorities set by the Roles. A User can also be assigned to more than one Role.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip of the Week: The Production Bill of Material – 10.7

The production bill of material is globally specified at the company level. It can be used as a source for the definition of the local material lists, such as:

  • The production model in the repetitive module.
  • The production model in the job shop module.
  • The subcontracting model in the subcontracting module.

The production bill of material can be generated through the engineering bill of material. The new production bill of material differs from the old bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The material line excludes logistic data (no warehouse nor routing operation).

The production bill of material is not mandatory.

Production bill of material revisions:
The production bill of material is revision controlled. The objective of the revision is to control the changes to the bill of material over time.

The P-bom includes this revision-related data:

  • Revision number
  • Effective date and Expiry date
  • Status (New, Approved, Expired)
  • Creation date and Created by: user
  • Approval date and Approved by: user
  • Expiry date and Expired by: user
  • Source information
Previous Article Infor LN & Baan Tip of the Week: Job Shop by Site Changes in LN 10.7
Next Article Infor LN & Baan Tip of the Week: Standalone Sessions in LN 10.7
Print
38371 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories