Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor M3 & Movex Tip of the Week: What inbound and outbound BODs are available for M3?

Frank Petrasio 0 27461 Article rating: 5.0

Outbound BODs from M3 to integrated applications
This table shows the BODs that are available with Infor M3. Where the product column is blank, the BOD is not currently used by interfacing products, but the BOD is generated by M3 and is available to be processed through ION and any application that is set up to receive it.

Read the full list of outbound and inbound BODs from M3 to integrated applications>

Infor LN & Baan Tip of the Week: What is Included with Infor Operating Service (Infor OS)?

Kathy Barthelt 0 35540 Article rating: 5.0

Infor Operating Service (OS) is a technology platform that supports fully integrated, industry-specific solution suites with mobile-first design, a consumer-inspired user experience, and science-driven analytics. It leverages the convergence of information, analytics, cloud computing, mobility, and social business.

This platform includes these products:

•    Infor Ming.le
•    Infor ION CE
•    ION Messaging Service (IMS)
•    Infor Data Lake
•    Infor Document Management
•    Infor Localization Services Platform (LSP)
•    Infor Localization Services

Read OS overview>

Infor LX & BPCS Tip of the Week: Installing WebTop Over LX

George Moroses 0 27743 Article rating: 5.0

If you plan to use Infor WebTop, the WebTop version 4.7 or above is required when running LX 8.4. Also, acquire and install the latest WebTop 4.7 patches from Infor Xtreme prior to running LX WebTop. WebTop 4.7 can be applied to your existing environments before you install 8.4.0. If this is completed before installing LX 8.4 then the LX install will take care of much of the Webtop server configuration automatically, including installing the LX Webtop metadata, updating WEB_ENV, and including the Webtop Platform library in the INLIBL data area as part of the environment setup. If you choose to install WebTop after the LX 8.4 installation is completed, the “Infor LX 8.4 Webtop 4.7 Configuration Guide” will guide you through all the configuration steps to set up Webtop for your LX environment.

LN & Baan Data Collection News – A BUSY 2nd Quarter for Crossroads RMC Data Collection!

Kathy Barthelt 0 31329 Article rating: 5.0

Crossroads RMC’s data collection implementation team was busy during the 2nd quarter of 2020 with 3 simultaneous go lives!
 

  1. FSB North America went live with Crossroads RMC's entire suite of warehouse management Data Collection applications for LN FP7
  2. Johnson Crushers International went live with Labor Reporting and Report Operations Complete for LN 10.6
  3. CTP/Tube Processing went live with Material Issue for LN FP6.
     

All installations included Crossroads RMC’s Analytics Dashboard which will be implemented to provide valuable insights into the data collection transactions performed in the warehouse and shop floor. 

Learn more about LN/Baan Data Collection - Web Collect (formerly RMC3) >
Learn more about Analytics Dashboard >

Infor LN & Baan Tip of the Week: Wrap Toolbar Option

Kathy Barthelt 0 34657 Article rating: 5.0

The Wrap Toolbar option has been added. You can use this option to wrap toolbar buttons to the next line if it becomes too narrow to add on the same line. If this option is selected, every session has the option available in the Personalization menu. This gives the user the possibility to change the wrapping state of the toolbar per session. This setting is saved as a personalization. You can configure this option in the Tools Parameters (ttaad0100m000) session and for specific users in the User Data Template (ttams1110m000) session.

Note: LN UI 12.2.6 or later is required.

An Infor LX upgrade in a month? Crossroads consultants make it happen!

George Moroses 0 29097 Article rating: 5.0

In August, BISCO, Inc. based in IL went live on their new IBMi 9 with Infor LX. This project included a dual migration from IBMi 7 to IBMi 9 and an upgrade from LX 8.3.4 to LX 8.3.5 using webtop. The Crossroads team led by Tim Baker, made this all happen in just a little over a month. BISCO will immediately move into the next phase of the project which will focus on an implementation of the Avalara Tax Interface to LX.

As stated by BISCO’s Senior Manager of Information Technology, “I want to express our complete gratitude for what a great job Crossroads RMC did in helping us get our BPCS LX Upgrade up and running. We were struggling to get over that hump and just couldn’t seem to bring this ERP to life… Crossroads RMC came in and saved the day, a fantastic job and the effort put forth was 2nd to none. Big Shout out to Tim Baker!!  I would highly recommend Crossroads RMC to any company.

BISCO is an ISO 13485 certified manufacturer of medical devices for the dental industry, specializing in adhesive and resin composite technology. Established in 1981, BISCO is an industry leader providing technically innovative aesthetic and restorative products to dental customers in the U.S. and in over 60 countries worldwide.

Learn more about Crossroads RMC Services>

Infor M3 & Movex Tip of the Week: What are M3 Web Services?

Frank Petrasio 0 30725 Article rating: 5.0

M3 Web Services Server is the runtime engine for M3 Web Services, which are wrappers for the business functionality provided by supported backend applications such as M3 Business Engine.

The M3 Web Services Grid Management pages provide some basic administrative capabilities. For example, you can view deployed web services, check the server setup for errors, do some basic configuration management, and manage web service security.

To create your own web services, you must also install the M3 Web Services Designer component, which allows you to design, model, deploy, and test web services.

RSS
First3536373840424344Last

Theme picker

Tips:  LX | BPCS | M3

TECHNOLOGY: Facility Security Ranges

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

FINANCE: Expiration Date for Quotes and RMAs

A Cancel-by-Date has been added to the Quote Header and RMA Header panels. This optional field can limit how long a quote or authorization to return items for credit is valid.  

For quotes, this enhancement provides an optional end date for the quote. For RMAs, it provides an optional date by which the customer must return the items to receive the credit listed on the RMA.

The Cancel-By-Date prints on the Order Acknowledgement and RMA Acknowledgement to inform the customer of this important limitation to the quote or return authorization. 

An Order Entry user cannot copy the quote to create a new order if the Cancel By Date has caused the quote to expire.

OPERATIONS: Default Split Salesperson to Customer Orders

Sales commissions are based on combinations of the Primary, Split, and Line-Level salesperson and the commission codes defined for the customer and item. You can now define the Split Salesperson in the same master files as the Primary Salesperson. While the Primary Salesperson is mandatory, the Split Salesperson is optional. It defaults during Order Create using the identical hierarchy as Primary Salesperson. Using Split Salesperson provides more flexibility in the calculation of sales commissions. The ability to define a default Split Salesperson improves the accuracy of sales commission qualification and calculation and reduces maintenance and adjustments necessitated by corrections.

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt

Infor LN & Baan Tips & Tricks for EXECUTIVES

FINANCE
Ledger Account Blocked Error
When attempting to post to a ledger account, users may occasionally encounter an error indicating that the ledger account is blocked. To resolve this issue, navigate to the Chart of Accounts session (tfgld0508m000) and select the Miscellaneous tab. Once there, review the Blocking field. The available settings are:

  1. Free
  2. Blocked for manual input (integration transactions and other automatic transactions can be posted with this setting)
  3. Blocked for all purposes.

OPERATIONS
Absorbing Cost Items into Projects
To absorb the cost of cost items into specific projects, you'll need to handle them as customized items. However, cost items cannot directly be defined as customized items. Customized items must be physical, either manufactured or purchased.

That said, it's still possible to absorb cost items into a project, although indirectly. Here's how:

  1. Set Up Ledger Account: First, create a new ledger account in session tfgld0508m000 and set the type to "PCS" (project) in the operations management integrations. This account will be used for matching and approving purchase orders for cost items.

  2. Create and Activate Projects: Ensure that the necessary projects are created and set to active status.

  3. Purchasing Cost Items:

    • If needed, create the cost items.
    • Create a purchase order for the cost items without referencing a project number.
  4. Matching PO to Costs:

    • When matching the purchase orders in session tfacp2107m000, select "Add Costs" from the specific menu on the toolbar (you'll need to be in the matching details to access this).
    • This will open session tfacp1133s000, where you will enter the previously specified ledger account number.
    • Once done, the "PCS Transactions" option on the toolbar becomes available. Selecting this brings up session tipcs3140m000 (General Actual Project Costs).
       
  5. Disbursing Costs to Projects: In session tipcs3140m000, the PO costs for the cost items can be disbursed to any open and active project.

Since these are cost items, they won't go into stock. The key is ensuring that the cost disbursement ("Add Costs") is correctly linked to the appropriate project, giving users visibility of the cost items as general project costs.


TECHNOLOGY
Adding a Timestamp to LN Standard Tables
Table Timestamp Definitions (ttadv4136m000)

Use this session to define timestamps for Infor LN tables. A timestamp is an additional column that stores the date and time of the last change for each record.

Timestamps are utilized by features like the extraction logic of CPM Enterprise Analytics. They enable CPM to perform incremental data extractions. For example, CPM can use the timestamps to extract records that were changed during the last week in a weekly extraction process.

To Create Timestamps:

  1. Enter the Tables: In this session, specify the tables for which you want to define timestamps.

  2. Convert and Reconfigure: Run the Convert to Runtime Data Dictionary (ttadv5215m000) session to convert the table definitions to the runtime data dictionary and reconfigure the tables.

  3. Restart Session: Log off and log back on to apply the changes.

IMPORTANT!
To avoid issues with locked tables, ensure that all users have logged off before starting the reconfiguration.

For more information, refer to the online help of the Convert to Runtime Data Dictionary (ttadv5215m000) session.

Previous Article Infor LN & Baan Tips & Tricks for FINANCE: Ledger Account Blocked Error
Next Article Infor LN & Baan Tips & Tricks for OPERATIONS: Absorbing Cost Items into Projects
Print
4662 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories