Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)

George Moroses 0 40621 Article rating: 5.0

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

Welcome to Our New Website - Please Take a Look Around!

Crossroads RMC 0 36671 Article rating: 5.0

We proudly announce the launch of Crossroads RMC’s brand new website!

We have been fortunate to serve customers for over 30 years and over that time, we have developed software solutions and consulting expertise to become your Go-To Experts for Infor LN / Baan, and Infor LX / BPCS and M3. 

Our website design focuses on our products and services simply and succinctly, while accentuating the reasons why working with Crossroads RMC has been the right choice for so many manufacturers and distributors worldwide. 

So come on in and take a look around! We hope you enjoy the new site and explore all of the information it has to offer.

If you think our new website is COOL, please leave a comment!If you think our new website is COOL, please leave a comment! 

Keep up-to-date with our latest announcements, industry news, and Infor ERP tips here on Crossroads Connections, Subscribe to our bi-monthly Newsletter and follow us on Facebook, LinkedInTwitter and YouTube.

Infor will no longer support LX or BPCS on IBM i 7.2 after April 30, 2021

George Moroses 0 41635 Article rating: 5.0

On September 10, 2019, IBM® announced the end of support of IBM i 7.2 effective April 30, 2021. In line with IBM’s support policy, Infor will no longer support LX, BPCS, SSAEAM, PRMS, BOSS and related products on IBM i 7.2 after April 30, 2021.

All releases, patches, and solutions are expected to be delivered and compiled for IBM i 7.3 effective May 1, 2021. These deliverables should install and function on version 7 release 3 (IBM i 7.3) and above. This will require that your operating system be at a minimum release level of IBM i 7.3.

This policy extends to other Infor LX related technologies including WebTop, System i Workspace (SIW), and Infor Development Framework (IDF).

If you have not done so already, we recommend you start planning and completing your upgrade to IBM i 7.3 or above prior to April 30, 2021. After this date, if you register a support call with Infor Support, and your application still runs on IBM i 7.2, you may be requested to upgrade to a supported version of the IBM i operating system.

In addition, we invite you to log on to Infor Concierge to view and download important information regarding Infor LX, BPCS, and Infor SSAEAM. General KB Articles have been created to proactively provide you with information regarding this Announcement (1397381) and the Infor BPCS/LX Product Lifecycle Policy (1947086).

Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 43542 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 17408 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

RSS
First3536373840424344Last

Theme picker

Tips:  LX | BPCS | M3

Role-Based Security introduces Role type profiles and allows combining the use of Role profiles with the traditional LX User type security profile functionality. The new Role type profile can be defined to allow or deny access to All Products, Attention Key, Products, Programs, and Transaction Effects. Facility, Warehouse, and Company securities are still defined solely by the User profile settings and are not affected by the assignment of a Role. Where applicable, the Role authority is displayed alongside the User authority on the security profile maintenance screens making it easy to see where there are differences in authority between the User and the assigned Roles. 

When Users are assigned to Roles, security access in LX becomes a combination of authorities granted or denied by the Role, plus any User Exceptions. User Exceptions override authorities set by the Roles. A User can also be assigned to more than one Role.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt

Tip of the Week: 10 Ways to Succeed at an OEE Project Where 90% Fail

  1. Collect the requirements. Learn from everyone with the intent of developing a phased approach to implementing on your shop floor with OEE being Phase 1. 
  2. Create your list. Capture all of required functions, taking into account what the “output” of the system will be. What does the plant manager need to see in real-time? What KPI’s does each line need displayed in real-time? What reports are required?
  3. Insist Upon Real-time. In the moment data for the right OEE is the right approach. If it’s possible, collect the data automatically. Remember that real-time feedback to line operators results in an automatic increase in OEE.
  4. Evaluate your lines. Focus where production counts can be monitored automatically. If the data is in your PLC’s, can you get it out? OPC communication is the right way to go here. If not, the approach is to install a new dedicated PLC with sensors installed on each line.
  5. Find Your Data Points. If automatic production monitoring is not applicable, what will be your collection points and how will you collect the data?
  6. Calculate the Load. Determine how to load the “job” you’re reporting on into the OEE system. This will typically be the order/operation or the product from the ERP.
  7. Recognize Great Data. Do not accept “manual collection of data” as a viable approach because it produces false results and is labor-intensive.
  8. Be Tough. Evaluate systems based on OEE specificity to start and expandability to future phase functions as determined by your requirements. Plan to justify the OEE purchase on its own merits.
  9. Go Easy. Make sure the system is easy to implement. Software installation and configuration should take no more than 2 weeks.
  10. Be Simple. Put together a detailed but simple project plan indicating who will do what, how long it will take, and how you will monitor progress.
Read Full Article

Optimize Your Manufacturing Today!

Previous Article Baan/LN Tip of the Week: 5 Ways to Motivate Your Employees
Next Article Tip of the Week: Gain Efficiency & Save Money - Evaluate Your Production Lines