Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 44794 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 19111 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

Infor LX & BPCS Tip of the Week: LX 8.4 Enhancement – Company Security for ACR510

George Moroses 0 11080 Article rating: 5.0

This enhancement provides LX Company Security to Invoice Maintenance, ACR510. Only users authorized to the invoice company can view or maintain invoices.

User must be authorized to ACR as a product or ACR510 as an individual program in Security Master Maintenance, SYS600. Additionally, ACR510-01, displays all records, but if the user tries to revise or display a transaction record for a company the user is not authorized to, this error message is displayed: “User is not authorized to the transaction company.”

Infor LX & BPCS Tip of the Week: Item Deletion Option in IDF Enterprise Items

George Moroses 0 14148 Article rating: 5.0

Previously, users were unable to delete items in IDF Enterprise Items when they have inventory balances or the item is connected to ancillary records, such as sales history records. This feature added in LX 8.4 provides the ability to delete an item when sales history records are found but all sales history activity is zero.

When the user attempts to delete an item in IDF Enterprise Items that is tied to a sales history record, the panel displays a message that the item cannot be deleted. The user can then run the Delete Validation Report to determine which records are tied to this item that prevents the validation. If the item no longer has manufacturing activity but had old sales history, the item can be deleted.

Infor LN & Baan Tip of the Week: In Transit Inventory Report – LN 10.7

Kathy Barthelt 0 21398 Article rating: 5.0

A new In-Transit Inventory report can be printed in the Print In-Transit Inventory (whinr1410m300) session. The report provides an overview of company inventory that is on the move and not stored in a warehouse. This concerns only inventory that is transferred from one warehouse to another. Items that are shipped to, for example, customers or projects, or items that are issued to production lines or service departments are excluded.

The report shows item inventory....

RSS
First3738394042444546Last

Theme picker

Tips:  LX | BPCS | M3

Previously, Material Requirements Planning (MRP) preferred practices meant that the component's due date was the same as the parent's shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower-level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The Multi-Level Shop Order Release, SFC5302, has a new parameter for shop orders. The Due Date of Children = Release Date of Prent (Due Date of Children) field allows the user to set the due date determined for multi-level shop orders.

This feature uses different exchange rates in the user's inventory processes by using new macros in Post Inventory to G/L, INV920D. INV920 used macros limited by the Override Exchange Rate parameter set on the book in Book Definition, CEA105D3. If the Override Exchange rate parameter is set to No, the macro uses the Rate Type of the Book. If the Override Exchange parameter is set to Yes, the macro uses the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Warehouse Company, Order Company, or the Book regardless of the Override Exchange Rate parameter in the Book.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Real Time Access to Your Data

Poor performance indicators make for poor outcomes.

Companies today continue to tolerate and accept how labor and production information is recorded, and the reliability on that information is questionable. In addition to collecting labor and production information, there are many other pieces of information manually recorded from the shop floor.

A critical element of information for productivity throughput would be to examine how much time the work center or machine was actually up and running. Downtime is another critical element of data that is usually manually recorded along with a reason identifying what caused production to stop. If this information is not provided on a timely and accurate basis, then what good is it anyway? Forms are filled out, data may or may not be keyed to a spreadsheet, the forms are sorted and filed, but is anybody really looking at the information that was recorded? Think about the amount of time it takes to manage the manual collection of information from your shop floor. 

What would real time access to data mean to your organization?
The benefits:

  1. Real Time Production Visibility
  2. Reduced Paperwork Load
  3. Downtime and Scrap Visibility
  4. WIP Inventory Visibility
  5. Improve Efficiency, Capacity Utilization

Optimize Your Manufacturing Today!

Previous Article Baan/LN Tip of the Week: January - Time to Reflect and Plan
Next Article Baan/LN Tip of the Week: Top 10 Survival Tips For Manufacturers
Print
32545 Rate this article:
No rating
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories