Infor LX/BPCS Tips & Tricks for FINANCE: Default Billing Reason Code from User Order Class

George Moroses 0 4116 Article rating: 5.0

This enhancement allows users to define a Default Billing Reason Code by User Order Class in addition to the Base Order Class. User Order Classes provide configurability for order processing events and the documents to be printed during those events. This enhancement allows users to configure different Billing Reason Codes for each User Order Class. If no specific code is defined, the system will default to the Billing Reason Code set up for the Base Order Class.

Infor LN & Baan Tips & Tricks for OPERATIONS: Order Quantity Dependent Routings vs Default Routings

Kathy Barthelt 0 6998 Article rating: 5.0

Order quantity-dependent routings

An automatically selected routing tailored to a specific production order quantity is useful. An example would be if the production order quantity is large, a routing with high production rates is used; If the order quantity is small, another routing is selected.

You can set up these quantity-dependent routings:

Infor LX/BPCS Tips & Tricks for OPERATIONS: Track all order holds added & released

George Moroses 0 4113 Article rating: 5.0

Enhancement: Order Hold Audit Functionality

This enhancement introduces an audit file to track all holds added or released for customer orders. The audit file includes details for various types of holds: credit hold, margin hold, customer hold, user hold, and credit card hold. All applications that add or release a hold now write an audit record, capturing the user, date, time, and program associated with each hold action.

A new IDF Order Hold Audit Inquiry application allows users to review holds based on various criteria:

  • Hold type
  • User
  • Specific order
  • Transactions for a customer within a date range
  • Other combinations

Additionally, the selected data can be printed if desired.

Infor LN & Baan Tip & Tricks for TECHNOLOGY: Infor LN Rest API

Kathy Barthelt 0 6037 Article rating: 5.0

Frequently Asked Questions (KB2316174)

For Infor LN a framework has been developed to support REST API-based services for lean integrations. This framework is now made available for the LN application. This KB answers some common questions you may have and procedures that are needed for using the LN Rest APIs.

More details on these topics can be found in the Infor LN REST API Administration Guide.

Infor LN & Baan Tips & Tricks for EXECUTIVES

Kathy Barthelt 0 6833 Article rating: 5.0

FINANCE: Can accounts receivable invoices be uploaded into LN using Excel?
Yes, this is possible, by following the steps below:

1. Maintain a batch

2. ....

OPERATIONS: MPS Planned vs. MRP Planned
When deciding what items should be MPS (Master Production Schedule) planned and what items should be MRP (Material Requirements Planning) planned, it's crucial to understand the nature of the items and their demand sources. Here's a breakdown:

Master Scheduled Items:

​
TECHNOLOGY: Are you running the latest Infor components?
Always good to stay on top of new releases for your various Infor components. Here is a list of knowledge base articles that you can check for the components listed below:

Infor LX / BPCS Tips & Tricks for EXECUTIVES

George Moroses 0 5881 Article rating: 5.0

FINANCE: Prevent Voiding of Selected Invoices
This enhancement prevents users from voiding invoices after they have been selected for payment. If a user selects an invoice for payment and another user voids the invoice during the payment process, it can produce erroneous and duplicate records. The ACP500 programs were modified to check the status of an invoice before it can be voided. If the invoice has been selected for payment, a message is generated, and the invoice cannot be voided.

OPERATIONS: Copy Shop Order
In the Shop Order Selection program, action 3=Copy is available. This action allows copying any shop order except for flow orders or campaign orders. Instead of copying from the parent item's bill of material and routing, the new shop order’s materials and operations will be copied from the selected shop order. Note that if the existing shop order is linked to a customer order or line, this linkage will not be copied to the new shop order.

TECHNOLOGY: Group Security for ILM501 Inbound Delivery Maintenance
Add function key / action code security to control who is authorized to create/revise/delete functions in ILM501 Inbound Delivery Maintenance.  With added Group Security, managers can control which users are authorized to create, change and delete deliveries in ILM501 Inbound Delivery Maintenance.

Infor LN & Baan OPERATIONS Tip: MPS Planned vs. MRP Planned

Kathy Barthelt 0 17569 Article rating: 5.0

When deciding what items should be MPS (Master Production Schedule) planned and what items should be MRP (Material Requirements Planning) planned, it's crucial to understand the nature of the items and their demand sources. Here's a breakdown:

  • Master Scheduled Items:

    • Master Scheduled Items are typically finished goods or service items.
    • These items receive their requirements from both Independent and Dependent demand sources.
       
  • Independent Demand:...
RSS
123468910Last

Theme picker

Tips:  LX | BPCS | M3

TECHNOLOGY: Facility Security Ranges

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

FINANCE: Expiration Date for Quotes and RMAs

A Cancel-by-Date has been added to the Quote Header and RMA Header panels. This optional field can limit how long a quote or authorization to return items for credit is valid.  

For quotes, this enhancement provides an optional end date for the quote. For RMAs, it provides an optional date by which the customer must return the items to receive the credit listed on the RMA.

The Cancel-By-Date prints on the Order Acknowledgement and RMA Acknowledgement to inform the customer of this important limitation to the quote or return authorization. 

An Order Entry user cannot copy the quote to create a new order if the Cancel By Date has caused the quote to expire.

OPERATIONS: Default Split Salesperson to Customer Orders

Sales commissions are based on combinations of the Primary, Split, and Line-Level salesperson and the commission codes defined for the customer and item. You can now define the Split Salesperson in the same master files as the Primary Salesperson. While the Primary Salesperson is mandatory, the Split Salesperson is optional. It defaults during Order Create using the identical hierarchy as Primary Salesperson. Using Split Salesperson provides more flexibility in the calculation of sales commissions. The ability to define a default Split Salesperson improves the accuracy of sales commission qualification and calculation and reduces maintenance and adjustments necessitated by corrections.

Previously, a user could complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600. This enhancement verifies the user security settings set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and completes the cost transfer process.

123468910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt

Introducing VJES (Visual Job Execution Software)

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface between engineering and the paperless manufacturing floor. VJES makes available only one version of the work instructions – the RIGHT one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES gives production personnel the best opportunity to build it right the first time and provides a way to track worker productivity during the build at every step.

VJES Overview

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improvement of quality score from 68/100 to 93/100 in 12 months
  • During the first month of use, employee training timeframe improved from 1 week, to 3 days.
  • First pass yield percentage at 100% for 8 months straight this year.
  • Able to incorporate a quality cell after productivity increased due to newfound bandwidth received when adopting VJES.


Request a demo or Contact us to learn more.

Print
8828 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories