Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Cost of Goods Sold

Anthony Etzel 0 28586 Article rating: No rating

A major change in LX Release 8.3.5 is the ability to post Cost of Goods Sold Inventory transactions by Cost Bucket. 

This will enable reporting of Cost of Goods Sold on the P&L by Material, Labor and Overhead. 

Up to this point, companies that wished to report at this level had to develop a modification to analyze these transactions and re-book them. This new feature eliminates that need. 

Optimize Your Manufacturing Today!

Tip of the Week: What is Your M.O.?

Kathy Barthelt 0 44484 Article rating: No rating

I’m not talking “Modus Operandi,” which is a fancy way to say: “what’s your plan to get stuff done”.  I’m talking about Manufacturing Optimization. 

It is all about efficiency, and by that I mean doing more with less. Less labor, less time, less materials, while still delivering a high quality product on time.

The Three Secrets to Improving your MO

1. Identify the key metrics
You need benchmark data so you know what realistic goals are, then track them and publish your performance along with a brief comment from time to time on how things are trending and how you compare with others, particularly your primary competitors. The best thing about this is that it is a system that develops a life of its own.

2. Measure it
Automatically, people start to think about improving things. Then the fun part, stuff begins to improve by itself. Once in place, the system just hums along and the benefits appear, because it has motivated people to think about it, and figure out what they can do to make it better.

3. Communicate it
So if you publish gross profit numbers, explain to people how what they do affects the numbers. Employees tend to start to modify their behavior as a result, and look more critically at whether a given purchase is even necessary.

Optimize Your Manufacturing Today!

April 25th 2018 -LUNCH & LEARN WEBINAR FOR Baan & LN

NAZDAQ's B2Win Suite: Giving You Maximum Control Over Your ERP Output

Kathy Barthelt 0 34354 Article rating: 5.0


Lunch & Learn Webinar for Baan & LN! 

- Giving You Maximum Control Over Your ERP Output -

NAZDAQ's B2Win Suite is the output management platform that every company needs in conjunction with its ERP system. This innovative product helps companies improve internal reporting and outbound communications.


Register today to learn how each core application is integrated into your system’s infrastructure to expand functionality, automation and improve business efficiency.

Here are a few features: 

  • Can be hosted on-premise or in cloud
  • Works with all Baan / Infor® LN versions and Mingle
  • Comes ready to work with various enterprise systems (ERP, CRM, SCM, etc.)
  • Connects with various multiple enterprise systems simultaneously (CRM, ERP, etc.)
  • Transform your ERP into different formats
  • Design completely custom formatting

 

Join us for 45 minutes: 


Watch Recorded Webinar

Crenlo and Crossroads RMC Go International

Crossroads RMC 0 16140 Article rating: No rating

Crenlo, A leading manufacturer of cab and enclosure products to protect people and electronics, has partnered with Crossroads RMC to deliver a shop floor (MES lite) solution to their facilities in the US and Brazil. Crenlo was looking for a way to ensure that each production run was complete and accurate, and their overall production efficiencies were measurable. Crossroads RMC developed a complete solution to deliver detailed proprietary work instructions to each workstation, configure production lines to fit the work to be completed, perform downtime tracking with alerts and provide web based pivot reports to view entire assemblies, compare actual to expected, view inspection failures and analyze trends week to week, month to month and year to year. This solution will be fully integrated with Crenlo’s Baan IV ERP system.

RSS
First7172737476787980Last

Theme picker

Tips:  LX | BPCS | M3

Previously, Material Requirements Planning (MRP) preferred practices meant that the component's due date was the same as the parent's shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower-level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The Multi-Level Shop Order Release, SFC5302, has a new parameter for shop orders. The Due Date of Children = Release Date of Prent (Due Date of Children) field allows the user to set the due date determined for multi-level shop orders.

This feature uses different exchange rates in the user's inventory processes by using new macros in Post Inventory to G/L, INV920D. INV920 used macros limited by the Override Exchange Rate parameter set on the book in Book Definition, CEA105D3. If the Override Exchange rate parameter is set to No, the macro uses the Rate Type of the Book. If the Override Exchange parameter is set to Yes, the macro uses the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Order Company. This enhancement provides macros that use the Rate Type of the Warehouse Company, Order Company, or the Book regardless of the Override Exchange Rate parameter in the Book.

12345678910Last

Theme picker

Tips: LN | Baan

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Plan Codes

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

Previous Article Baan/LN Tip of the Week: Data Sizing Moving to LN
Next Article Baan/LN Tip of the Week: Purchase Inquiry
Print
45329 Rate this article:
No rating
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

x

Categories